1. Stage ONE demo - you can see the main drain (for toilets upstairs) on the left without the cabinets that it was inside of the plumbing parts on the lower right where the sink was.
This is the view from the doorway - sink was on the left toilet was on the right. All that was left was the linoleum floor and wall and a little bit of plumbing.
2. Stage TWO - this is where our main drain for the house happen to be so the whole floor was dug up. New drain pipes are put in. The walls are re-framed, moved over into the hallway a little bit to make room for a neo-angle shower. This s the view from the doorway.
This is the view from the other side of the wall behind where the sink was.
This was my house's main drain pipe dug out of the ground. Rusted and no good. Reminds me of the movie Titanic. Adios!
They've poured the concrete back for the ground and rough-ins are all in! I'll try to post the pics tomorrow. The light is getting brighter at the end of the tunnel! I'm started to get very anxious to see it all come together.